Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-user-frontend domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/civijpnh/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-paginate domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/civijpnh/public_html/wp-includes/functions.php on line 6114
Pile Cap Estimate | Free Download AutoCAD File & PDF
Site icon Civil Engineer 9

Pile Cap Estimate | Free Download AutoCAD File & PDF

Pile Cap Estimate AutoCAD File & PDF Download

Pile Cap Estimate AutoCAD File & PDF Download

In this article, we will estimate and cast analyses of pile caps and reference them with practical work. Also, provide an AutoCAD file of pile cap details drawing for free download.

Pile Cap Estimate

Pile Cap Estimate

The below estimate of rods, cement, sand & stone for the pile cap.

Volume of Concrete

Given Data:

The pile cape height (T) is 5″+30″, but 5″ has a primary surface making for the pile cap, it will be only C.C. Originally we will get height = 30″, Length = 112″ & Breadth = 42″

Volume = (30 x 102 x 42) / 1728 = 74.38 Cft (Cubic Foot)

The Casting Ration is 1:1.5:3

Cement: (74.38 x 1.5)/(1+1.5+3)= 111.57/5.5 = (20.29x 1) = 20.29 cft [1bag cement equal to 1.25 cft] so, 20.29/1.25 = 16.23 bag cement.

Sand: (74.38 x 1.5)/(1+1.5+3)= 111.57/5.5 = (20.29 x 1.5) = 30.44 cft sand.

Stone or Coarse Aggregate: (74.38 x 1.5)/(1+1.5+3)= 111.57/5.5 = (20.29 x 3) = 60.87 cft stone.

Estimate of Reinforcement or Rod

The side clear cover will be 3″ and the Bottom clear cover is 6″ from the Design criteria. If not mentioned to follow the regional building code system or ASTM.

Bottom Mesh Reinforcement

Main Rod 20mm @4″ c/c = 8’6″ – (3×2)” x ((3’6″ – (2×3))/4″+1)

or = (102″ – 6″) x (((42″-6″)/4) + 1)

=96″x (9+1)

=960 inches

=80 feet

Total weight of 20mm rod = (80 x 0.75) = 60kg

Binder Rod 16mm @5″ c/c = (42″-6″) x (((102″-6″)/5) +1)

= 36″ x ((96/5)+1)

= 36″ x (19.2+1) or [19+1]

=36″x 20

=720 inches

= 60 Feet

Total weight of 16mm rod = (60×0.48) = 28.8 kg

Side Mesh Reinforcement

The pile cap height is 30 inches, but the side mesh bar height will be = 30″ – (bottom clear cover 6″ + bottom mesh 20mm & 16 mm bar hight + top mesh 12mm & 12mm hight + top clear cover 1.5″ ) = 30″ – (6″+1.4″+0.95″+1.5″) = 30″-9.85″ = 20.15 or 20 inches

8′-6″ Side Mesh 10mm @ 6″ c/c

Vertical = (20″+(6″x2)) x ((96/6)+1) = 32″x17= 544″ = 44.33 feet

Horizontal = (8’+ (6″x2)) x (20″/6+1) = 8’+1′ x 4.3 = 9’x4 = 36 feet

3′-6″ Side Mesh 10mm @6″ c/c

Vertical = (20″+(6″x2)) x ((36/6)+1) = 32″x7 = 224″ =18.66 feet

Horizontal = (3’+ (6″x2)) x (20″/6+1) = 3’+1′ x 4.3 = 4×4 = 16 feet

Total weight of 10mm rod = 44.33+36+18.66+16 = 115 feet x 0.188 = 21.62 kg